Huang wei Homepage    
<<  MMS开发流程思考  |  首页 |  我国电网调度自动化发展  >>    
欧洲IEC 61850项目CORBA

IST Project Fact Sheet

Distributed Objects Telecontrol Systems and Networks

Funded under 5th FWP (Fifth Framework Programme)

Action Line: Technologies for management of information processing, communications and networks, including broad-band, together with their implementation, interoperability and application - Concurrent systems

Coordinator

Contact Person: Name: RODRIGUEZ-LOPEZ, Francisco Jose
Tel: +34-91-3835747
Fax: +34-91-3029249
Email: flopez@eliop.es

Organisation:

Eliop S.A.

Research and Development Department

Avenida de Manoteras 30

28050   Madrid

SPAIN

The main objective is to establish an open software model, built upon real-time distributed object technologies and emergent tele-control standards, to allow the optimum exploitation of the interoperation capabilities of devices and systems in the distributed context of an electric power grid. The project addresses outstanding problems in this context, and its results would be applicable to several other industrial control systems. In particular, Real-time and Minimum CORBA (Common Object Request Broker Architecture), as well as the emerging IEC-61850 standard for "control systems in electrical substations" are the supporting technologies of the proposed development of adequate tools and middleware. Putting into operation a pilot tele-control system is also envisaged within this project in order to demonstrate the validity of the approach under real-world conditions. Finally, promotion and contribution to relevant standardization are core ideas of the project.

Objectives:
The main objective will be achieved through the following specific objectives:
- Definition of a mixed model for distributed telecontrol networks at electric power;
- Mapping of the IEC-61850 abstract communications interface (ACSI) to CORBA;
- Development of a GUI (Graphical User Interface) configuration tool for interoperation of devices;
- Development of a GUI Operator Interface tool to interact with the embedded objects;
- Development of the software to be embedded in a Remote Terminal Unit running at the power substation.

Project details

Project Acronym: DOTS
Project Reference: IST-1999-10258
Start Date: 2000-01-01
Duration: 26 months
Project Cost: 2.93 million euro
Contract Type: Cost-sharing contracts
End Date: 2002-02-28
Project Status: Completed
Project Funding: 1.61 million euro

 

Participants

INNOVA S.P.A.

ITALY

Uninova - Instituto de Desenvolvimento de Novas Tecnologias

PORTUGAL

Scilabs Ingenieros, S.L.

SPAIN

Getronics-Decan

FRANCE

Red Electrica de Espana, S.A.

SPAIN

Universidad Politecnica de Madrid

SPAIN

 





china.huangwei  发表于  2004-07-12 10:29  引用(Trackback0)